A change order is a formal document that outlines changes to a construction project’s scope of work, schedule or budget. On the other hand, a construction change directive is an order issued by the owner or architect that requires a change in the work without specifying the change’s details. The contractor is responsible for proposing the scope of the change and the cost, which the owner must then approve before the additional work can proceed.